Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Car maintenance
3. Четырехцилиндровыв engines
4. VS engines
5. All engines
5.1. General information
5.2. Compression check in engine cylinders
5.3. Dismantle of the power unit - security measures
5.4. The engine - removal and installation
5.5. Major maintenance of the engine - general information
5.6. Engine restoration - alternatives
5.7. Major maintenance of the engine - a dismantling order
5.8. A head of the block of cylinders - dismantling.
5.9. Head of the block of cylinders cleanings and condition check
5.10. A head of cylinders - assembly
5.11. Shatunno-porshnevaya group dismantle
5.12. The crankshaft - dismantle
5.13. The block of cylinders - cleaning
5.14. The block of cylinders - condition check
5.15. Rods and pistons - condition check
5.16. The crankshaft - condition check
5.17. Radical and shatunny bearings - check and selection
5.18. Major maintenance of the engine - an assembly order
5.19. Piston rings - installation
5.20. The crankshaft - installation and check of gaps of radical bearings
5.21. A back epiploon - installation
5.22. Rods and pistons - installation and check of gaps in shatunny bearings
5.23. Engine start-up after repair and a running in
6. Systems of cooling, heating, ventilation and conditioning
7. Fuel and exhaust systems
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
14. Brake system
15. Suspension brackets and steering
16. Body and furnish elements
17. Electric equipment system
 






5-10-golovka-cilindrov-sborka.html

5.10. A head of cylinders - assembly

1. Be convinced of purity of a head of cylinders.
2. Establish basic washers of springs.
3. Napressuyte on directing plugs new oil - demountable caps by means of an opravka or the adaptation (photo). Rotation of caps at a napressovka is not allowed
4. Oil a valve core for the engine and establish the first valve. Establish a plate and crackers and check spring height in working condition (i.e. distance between a basic washer and the bottom surface of a plate in position of the closed valve, a photo). If necessary adjust height installation of additional basic washers.

10.3 Napressovka of caps by means of the adaptation


10.4 Check of height of a spring in working condition


5. Remove a plate and crackers and establish both springs a dense navivka down (photo).
6. Compress springs and establish crackers. If necessary grease crackers with konsistentny greasing temporarily to fix on a core of the valve (photo).
7. Similarly establish other valves. Again check height of springs (photo) and adjust basic washers. Installation of superfluous basic washers is not allowed if the initial height of a spring in working condition corresponds to norm.

10.5 Orientation of springs of valves at assembly


10.6 Grease crackers for fixing on a valve core


10.7 Repeated check of height of springs


11.1 Fillet removal in the cylinder with the help ра zvertka    


11.3 Rod marking with the indication of number of the cylinder


8. Establish a cam-shaft, rollers with yokes and pushers (on V6 engines).
9. On 4 - cylinder engines adjust gaps in valves, having established gaps for the cold engine.

«previous page
5.9. Head of the block of cylinders cleanings and condition check
following page»
5.11. Shatunno-porshnevaya group dismantle