Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Car maintenance
3. Четырехцилиндровыв engines
4. VS engines
5. All engines
6. Systems of cooling, heating, ventilation and conditioning
7. Fuel and exhaust systems
7.1. Fuel system - general information
7.2. The fuel filter - replacement
7.3. Idling turns - check and adjustment
7.4. The fuel highway - repair
7.5. A cable of a drive of a butterfly valve - removal and installation
7.6. A pedal - removal and installation
7.7. The fuel pump - check
7.8. The fuel pump - removal and installation
7.9. System of electronic injection of fuel - general information
7.10. Units of control and measuring system with the processor ECCS block - general information
7.11. Decompression of fuel system
7.12. The butterfly valve case (for systems with preliminary injection of TBI of systems) removal and installation
7.13. Nozzle replacement
7.14. System of injection of fuel – adjustments System of preliminary injection (TBI)
7.15. Fuel system cleaning
7.16. Tank removal and installation
7.17. Fuel level sensor removal and installation
7.18. Tank washing
7.19. Exhaust system general information
7.20. Forward exhaust pipe removal and installation
7.21. Catalytic neytralizatorsnyaty and installation
7.22. Exhaust silencer removal and installation
7.23. Average pipe removal and installation
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
14. Brake system
15. Suspension brackets and steering
16. Body and furnish elements
17. Electric equipment system
 






7-11-dekompressiya-toplivnojj-sistemy.html

7.11. Decompression of fuel system

1. Get a safety lock of the fuel pump (photo).
2. Start the engine and wait its stops.
3. Make 23 attempts to start the engine.

10.21 Air temperature sensor


11.1 Safety lock of the fuel pump


4. Switch off ignition
5. After works put into place a safety lock.

«previous page
7.10. Units of control and measuring system with the processor ECCS block - general information
following page»
7.12. The butterfly valve case (for systems with preliminary injection of TBI of systems) removal and installation