Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Car maintenance
3. engines
4. VS engines
5. All engines
6. Systems of cooling, heating, ventilation and conditioning
7. Fuel and exhaust systems
7.1. Fuel system - general information
7.2. The fuel filter - replacement
7.3. Idling turns - check and adjustment
7.4. The fuel highway - repair
7.5. A cable of a drive of a butterfly valve - removal and installation
7.6. A pedal - removal and installation
7.7. The fuel pump - check
7.8. The fuel pump - removal and installation
7.9. System of electronic injection of fuel - general information
7.10. Units of control and measuring system with the processor ECCS block - general information
7.11. Decompression of fuel system
7.12. The butterfly valve case (for systems with preliminary injection of TBI of systems) removal and installation
7.13. Nozzle replacement
7.14. System of injection of fuel adjustments System of preliminary injection (TBI)
7.15. Fuel system cleaning
7.16. Tank removal and installation
7.17. Fuel level sensor removal and installation
7.18. Tank washing
7.19. Exhaust system general information
7.20. Forward exhaust pipe removal and installation
7.21. Catalytic neytralizatorsnyaty and installation
7.22. Exhaust silencer removal and installation
7.23. Average pipe removal and installation
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
14. Brake system
15. Suspension brackets and steering
16. Body and furnish elements
17. Electric equipment system
 






7-toplivnaya-i-vykhlopnaya-sistemy.html

7. Fuel and exhaust systems




Specifications of engines with fuel injections (24 and 6), the sizes and gaps are given in mm
Check and adjustment of turns of idling
For engines with preliminary injection (preparation of gas mixture)
G gap (between the roller of draft and a cam, see the text)
0,5-3,0
Installation of a gap of G at adjustment
0,8-2,0
Gap installation for engines with direct injection of fuel (24)
From a manual transmission
2,3
With automatic transmission
2,1
Adjusting data of the automatic proof-reader of idling
Idling turns (at the switched-off conditioner)
Cars from a manual transmission
4-cylinder engine
900+50 rpm
V6
800+50 rpm
Cars with automatic transmission
4-cylinder engine
650+50 rpm
V6
70050 rpm
Idling turns at the switched-on conditioner (transmission in situation N)
900+50 rpm
Turns at which the rod of the pneumoshock-absorber adjoins to the butterfly valve lever
4- engine
160050 rpm
V6
130050 rpm
Fuel pump
Pressure of fuel (in kgf/cm2)
For engines with preliminary preparation of gas mixture
2,3
For engines with direct injection of fuel
V6 engine
With additional depression
2,1
Without depression
2,7
K24 engine
With additional depression
2,05
Without depression
2,7

The inhaling moments (in N of m)
Nuts of the case of a butterfly valve
Till 1992.
11-15,5
1993.
1st stage of an inhaling
8-10
2nd stage
16-20
Bolts of the electromagnetic valve of an otsechka of fuel
23
Drain stopper of a fuel tank
48
Bolts of a back arm of a fuel tank
45
Bolts of fastening of a fuel tank
Till 1990.
8,5
Since 1991.
24-32
Bolts of fastening of catalytic converter

Till 1990.
33
Since 1991 for the Pathfinder car V6 engine
38-50
Bolts of fastening of a forward exhaust pipe to final a stake - to the lecturer
To.1990 g.
20
Since 1991 for the Pathfinder car V6 engine
36-42

previous page
6.19. The control panel a heater and the conditioner - removal, installation and adjustment
following page
7.1. Fuel system - general information