Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Car maintenance
3. Четырехцилиндровыв engines
4. VS engines
4.1. General information
4.2. Types of the repair work which is carried out without dismantle of the engine from the car
4.3. An order of installation of the piston of the 1st cylinder in VMT of a step of compression.
4.4. Covers of heads of cylinders – removed and installation
4.5. The roller with yokes - removal and installation
4.6. Hydropushers - removal and installation
4.7. A soaking-up collector - removal and installation
4.8. A final collector - removal and installation
4.9. A pulley - an uspokoitel - removal and
4.10. A gear belt - removal and installation
4.11. A forward epiploon of the crankshaft - replacement
4.12. A cam-shaft epiploon - replacement
4.13. Heads of cylinders - removal and installation
4.14. A cam-shaft - removal and installation
4.15. Details of the klapanny mechanism - check
4.16. The oil pallet - removal and installation
4.17. The oil pump - removal, check and installation
4.18. A back epiploon - replacement
4.19. A flywheel (a leading disk of the hydrotransformer) -
4.20. Engine support - replacement
5. All engines
6. Systems of cooling, heating, ventilation and conditioning
7. Fuel and exhaust systems
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
14. Brake system
15. Suspension brackets and steering
16. Body and furnish elements
17. Electric equipment system
 






4-7-vsasyvayushhijj-kollektor-snyatie-i-ustanovka.html

4.7. A soaking-up collector - removal and installation

Removal
1. Depressurize fuel system and disconnect the battery from weight.
2. Merge liquid.
3. Remove the air filter, the butterfly valve case, disconnect wires from candles and uncover the distributor.
4. Disconnect the retsirkulyatsiya valve.
5. Remove a belt of the conditioner and an arm of a roller of a natyazhitel of this belt (photo).

7.5 Bolts of fastening of a roller of a natyazhitel of a belt of the conditioner


7.9 An order of an otpuskaniye of bolts of a soaking-up collector


6. Disconnect from the thermostat a hose perepuskny a hose and the top hose of a radiator.
7. Designate from a collector and disconnect vacuum hoses, wires and cables.
8. Disconnect a heater hose in a back part of a collector.
9. Evenly unscrew bolts and nuts in the specified sequence and carefully remove soaking-up collector.
Installation
10. Clear a collector, banish all carvings.
11. Establish on a collector new laying (having fixed according to the instruction enclosed to this detail).
12. Without breaking the provision of laying, establish a collector and wrap bolts and nuts. Evenly tighten bolts and nuts with the set moment, in the specified sequence (photo).
13. Other operations are carried out in the return sweat to a ryadka.

8.4 Details of the right final collector
1. Laying
2,3. Thermal guards
4. Collector


7.12 An order of a tightening of bolts of a soaking-up collector



«previous page
4.6. Hydropushers - removal and installation
following page»
4.8. A final collector - removal and installation