Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Car maintenance
3. Четырехцилиндровыв engines
3.1. General information
3.2. Types of the repair work which is carried out without dismantle of the engine from the car
3.3. An order of installation of the piston of the 1st cylinder in VMT of a step of compression.
3.4. A cover of a head of cylinders - removal and installation
3.5. The roller with yokes - removal and installation
3.6. The roller with yokes - dismantling and assembly
3.7. A cam-shaft - removal and installation
3.8. A cam-shaft, support and yokes - check
3.9. Springs of valves and maslosjemny caps - replacement
3.10. A soaking-up collector - removal and installation
3.11. A final collector - removal and installation
3.12. A head of cylinders - removal
3.13. A head of cylinders - installation
3.14. The oil pump - removal and installation
3.15. The oil pump - check
3.16. A crankshaft pulley - removal and installation
3.17. A forward epiploon of the crankshaft - replacement
3.18. A forward cover - removal and installation
3.19. A chain and asterisks - removal and installation
3.20. The oil pallet - removal and installation
3.21. A flywheel (a leading disk of the hydrotransformer) - removal and installation
3.22. A back epiploon - replacement
3.23. Engine support - replacement
4. VS engines
5. All engines
6. Systems of cooling, heating, ventilation and conditioning
7. Fuel and exhaust systems
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
14. Brake system
15. Suspension brackets and steering
16. Body and furnish elements
17. Electric equipment system
 






3-11-vypusknojj-kollektor-snyatie-i-ustanovka.html

3.11. A final collector - removal and installation

1. Disconnect tubes of an ezhektsiya of air, remove the case of valves (if it is provided).
2. Disconnect the channel connecting a collector and the air filter.
3. Remove a thermal guard.
4. Disconnect a tube of a retsirkulyatsiya (photo).
5. Lift a forward part of the car and establish on supports.
6. Disconnect a forward exhaust pipe.
7. Disconnect wires from candles from a final collector.
8. Unscrew bolts and collector nuts.

11.4 Tubes of an ezhektsiya of air (at the left) and retsirkulyatsiya (on the right) on a final collector  of the Z24i engine


12.13а Sequence of weakening of bolts of a head of cylinders on Z24 engines


12.13б Sequence of weakening of bolts of a head of cylinders on K24 engines


13.2 Head of cylinders of the K24 engine
1 Rollers of yokes and yoke of valves
2. Head of cylinders
3. Laying
4. Bolt
5. Cam-shaft
6. Saddle
7. The directing plug
8. Basic washer
9. Maslosjemny cap
10. Crackers
11. Plate
12. Inlet


9. Disconnect a collector.
10. Clear a collector of the consolidation remains.
11. Establish on a head of cylinders new laying. Tighten by hand bolts and nuts.
12. In 3-4 receptions tighten bolts and nuts with the set moment. Tighten from the center to the periphery in a cross order.
13. Other operations are carried out upside-down.
20. Warm up, the engine and be convinced of tightness of connections of a collector.

«previous page
3.10. A soaking-up collector - removal and installation
following page»
3.12. A head of cylinders - removal