4-6-gidrotolkateli-snyatie-i-ustanovka.html
4.6. Hydropushers - removal and installation1. Uncover heads of cylinders.
2. Fix hydropushers rubber rings from drop-out (photo).
3. Take the case with hydropushers (photo).
4. Get pushers and store in an order of their installation.
5. Check a pusher course, having pressed on it (photo). If the course exceeds 1 mm, in a hydropusher air got.
6. If the course exceeds norm, establish all details the removed gazoraspredeleniye and start the engine.
7. Finish turns to 1000 rpm, through 10 mines stop the engine.
8. Remove the case with pushers and again check a course. If at a pusher still there is an air, pushers replace.
9. Check a condition of pushers (see below).
10. Installation is carried out upside-down.
|
6.5 For check of a course of a hydropusher press on it in the direction specified by an arrow
1. Hydropusher
|
|