Nissan Terrano 2 from 1985 to 1999
1. Maintenance instruction and to maintenance
2. Car maintenance
3. Четырехцилиндровыв engines
4. VS engines
4.1. General information
4.2. Types of the repair work which is carried out without dismantle of the engine from the car
4.3. An order of installation of the piston of the 1st cylinder in VMT of a step of compression.
4.4. Covers of heads of cylinders – removed and installation
4.5. The roller with yokes - removal and installation
4.6. Hydropushers - removal and installation
4.7. A soaking-up collector - removal and installation
4.8. A final collector - removal and installation
4.9. A pulley - an uspokoitel - removal and
4.10. A gear belt - removal and installation
4.11. A forward epiploon of the crankshaft - replacement
4.12. A cam-shaft epiploon - replacement
4.13. Heads of cylinders - removal and installation
4.14. A cam-shaft - removal and installation
4.15. Details of the klapanny mechanism - check
4.16. The oil pallet - removal and installation
4.17. The oil pump - removal, check and installation
4.18. A back epiploon - replacement
4.19. A flywheel (a leading disk of the hydrotransformer) -
4.20. Engine support - replacement
5. All engines
6. Systems of cooling, heating, ventilation and conditioning
7. Fuel and exhaust systems
8. System of electric equipment of the engine
9. System of decrease in toxicity of exhaust gases
10. Mechanical transmission
11. Automatic transmissions
12. Coupling driveshaft and back bridge
13. A running gear of cars with a wheel formula 4x4
14. Brake system
15. Suspension brackets and steering
16. Body and furnish elements
17. Electric equipment system
 






4-6-gidrotolkateli-snyatie-i-ustanovka.html

4.6. Hydropushers - removal and installation

1. Uncover heads of cylinders.
2. Fix hydropushers rubber rings from drop-out (photo).
3. Take the case with hydropushers (photo).
4. Get pushers and store in an order of their installation.
5. Check a pusher course, having pressed on it (photo). If the course exceeds 1 mm, in a hydropusher air got.
6. If the course exceeds norm, establish all details the removed gazoraspredeleniye and start the engine.
7. Finish turns to 1000 rpm, through 10 mines stop the engine.
8. Remove the case with pushers and again check a course. If at a pusher still there is an air, pushers replace.
9. Check a condition of pushers (see below).
10. Installation is carried out upside-down.

6.5 For check of a course of a hydropusher press on it in the direction specified by an arrow
1. Hydropusher



«previous page
4.5. The roller with yokes - removal and installation
following page»
4.7. A soaking-up collector - removal and installation